Data Cabling Installation in Newcastle

We install full-scope fibre cabling systems for MDUs and high-rise sites in Newcastle.
ACMA-certified technicians • 500+ projects completed • Minimum engagement $5,000.

Why Newcastle contractors choose us

  • ✔ OTDR and Fluke test reports supplied with every job
  • ✔ Fully compliant with NBN and OptiComm requirements
  • ✔ After-hours transitions available to suit live buildings

Included in our scope

Riser cabling • Floor distribution • Fusion splicing • Signal testing • As-built documentation.

Common questions – Newcastle fibre

  • Which fibre do you use?
    We use OS2 (singlemode) fibre by default. Multimode is available if needed.
  • Can you work within existing infrastructure?
    Yes – we reuse conduits and trays whenever possible to reduce cost and disruption.
  • Are test results included?
    Yes – you’ll receive OTDR and Fluke certification in PDF format on request.
  • Are you licensed for NSW work?
    Absolutely. Our teams are ACMA-registered and carry the appropriate insurance for jobs in Newcastle.
  • Do you meet all carrier handoff standards?
    Yes – we deliver to NBN and OptiComm specs and manage the required compliance paperwork.
  • How soon can you start?
    Usually within 1 to 2 weeks. Priority projects can be booked sooner.
  • After-hours or weekend work available?
    Yes – we offer flexible scheduling to suit active sites and live tenants.

Case study | Gladstone Apartments, VIC

Turnkey FTTP fibre install for a 700-unit MDU in central Melbourne. Scope covered risers, floor runs, splicing, testing and carrier-ready delivery.

Request your fixed quote for Newcastle fibre cabling
Call 1800GOHAWK (1800 464 295) or book your site walk.