Data Cabling Installation in Brisbane

We build carrier-grade MDU fibre cabling systems in Brisbane – from riser design to OTDR handover.
Fully accredited techs • 500+ MDU projects completed • Minimum engagement: $5,000.

Why Brisbane builders choose us

  • ✔ OTDR and Fluke PDF reports as standard
  • ✔ Prepped for OptiComm and NBN onboarding
  • ✔ Night and weekend deployment available to avoid downtime

Work typically includes

Vertical risers • Horizontal floor cabling • Fusion splicing • Light loss testing • As-built documentation.

Brisbane fibre cabling – FAQs

  • What kind of fibre do you use?
    OS2 (singlemode) is standard across all builds. OM3 and OM4 available when required.
  • Can you use existing cable trays and ducting?
    Yes – we always inspect and reuse containment if possible to streamline delivery and reduce costs.
  • Do I get test results?
    Yes – you’ll receive OTDR and Fluke test results in PDF format. All testing is certified.
  • Are you licensed in Brisbane?
    All our cablers are ACMA-accredited with the necessary endorsements and insurance for QLD work.
  • Do you handle NBN/OptiComm compliance?
    Absolutely – we deliver to spec and manage the documentation required for handover.
  • What’s your typical lead time?
    Most installs are booked within 1–2 weeks. Rush jobs can be prioritised.
  • Can you work outside of business hours?
    Yes – after-hours cutovers are part of our service for occupied or live buildings.

Project snapshot | Gladstone Apartments, VIC

700-unit MDU fibre deployment in Melbourne. Scope included risers, splicing, OTDR testing, and full carrier handover compliance.

Get a fibre quote in Brisbane
Call 1800GOHAWK (1800 464 295) or book a walkthrough.