Data Cabling Installation in Brisbane
We build carrier-grade MDU fibre cabling systems in Brisbane – from riser design to OTDR handover.
Fully accredited techs • 500+ MDU projects completed • Minimum engagement: $5,000.
Why Brisbane builders choose us
- ✔ OTDR and Fluke PDF reports as standard
- ✔ Prepped for OptiComm and NBN onboarding
- ✔ Night and weekend deployment available to avoid downtime
Work typically includes
Vertical risers • Horizontal floor cabling • Fusion splicing • Light loss testing • As-built documentation.
Brisbane fibre cabling – FAQs
- ❓ What kind of fibre do you use?
OS2 (singlemode) is standard across all builds. OM3 and OM4 available when required. - ❓ Can you use existing cable trays and ducting?
Yes – we always inspect and reuse containment if possible to streamline delivery and reduce costs. - ❓ Do I get test results?
Yes – you’ll receive OTDR and Fluke test results in PDF format. All testing is certified. - ❓ Are you licensed in Brisbane?
All our cablers are ACMA-accredited with the necessary endorsements and insurance for QLD work. - ❓ Do you handle NBN/OptiComm compliance?
Absolutely – we deliver to spec and manage the documentation required for handover. - ❓ What’s your typical lead time?
Most installs are booked within 1–2 weeks. Rush jobs can be prioritised. - ❓ Can you work outside of business hours?
Yes – after-hours cutovers are part of our service for occupied or live buildings.
Project snapshot | Gladstone Apartments, VIC
700-unit MDU fibre deployment in Melbourne. Scope included risers, splicing, OTDR testing, and full carrier handover compliance.
Get a fibre quote in Brisbane
Call 1800GOHAWK (1800 464 295) or book a walkthrough.